1. Product Introduction of Copper ingot mold
Lufeng factory is one of the leading Copper ingot mold manufacturers and suppliers in China, also supporting customized service. Be free to wholesale high quality products from our factory. The ingot mold is used for smelting and forming of crude Lead Zinc Copper and Aluminum.
Copper ingot mold is smelted in a blast furnace or rotary furnace and then cast into an copper ingot mold to form an ingot.
2. Product Parameter (Specification) of Copper ingot mold
1 |
Material |
heat-resistant cast iron or heat-resistant alloy steel |
2 |
Capacity |
25-2500kg, customized |
3 |
Manufacturing method |
casting |
4 |
Thickness |
40~90mm |
3. Product Feature And Application of Copper ingot mold
The material of copper ingot mold can be heat-resistant ductile iron or heat-resistant alloy steel, which is an important mold for copper smelting and casting metal ingots.
4. Product Details of Copper ingot mold
1). High temperature resistance;
2). Heat-resistance is up to 1000-1200℃;
3). Exported to more than 20 countries;
4). Technical guidance of experienced engineers from big copper smelters for lead refining process is available.
5). Integrated copper refining plant design available.
5. Product Qualification of Copper ingot mold
The Copper ingot mold is made of heat-resistant cast iron. The logo and size style can be designed according to customer requirements. After casting, we will carry out heat treatment, grinding, machining and other treatments on the mold according to the requirements.
6. Deliver, Shipping And Serving of Copper ingot mold
The casting cycle of Copper ingot mold is generally about 30-45 days. Packed in wooden cases or pallets. Ensure the safety of lead ingots during transportation and the quality of products.
7. FAQ
1. How many years have your company made this kind of equipment?
RE: Since 2010.
2. Do you have detailed and professional installation manual?
RE: We provide detailed installation, operation and maintenance instructions.
3. Are you a trading company or a manufacturer?
RE: We are directly design and manufacturing supplier.
4. Can you can design the equipment according to our size?
RE: Sure. We provide non-standard designed and manufactured equipment.
5. How many staff abroad you sent to install the equipment?
RE: Provide 2-3 engineers to guide installation and commissioning. 1-2 mechanical engineers, 1 Automation Engineer.
6. How many days you need to install the equipment?
RE: The equipment specifications and quantities of each project are different, and the normal single unit lasts about 30 days.